| Equipment | Areas Classified as ClassI, Division 1 | Areas Classified as ClassI, Division 2 |
|---|---|---|
| Smaller Solvent Recovery Equipment Capacity less than 23 litres (5 gals.). Receiver containers are part of the equipment if not outdoors. |
Within 1.5 m (5 ft.) in all directions from the edge of the equipment | Within 0.9 m (3 ft.) beyond Division 1 in all directions
Up to 0.9 m (3 ft.) above floor or grade level and within 6 m (20 ft.) horizontally beyond Division 1* |
| Larger Solvent Recovery Equipment Capacity 23 litres (5 gals.) or more. |
The room or building containing the equipment, as required in section 4.1 | None |
| Vents Piped to Outdoors Solvent recovery equipment vents (including safety valves) and container vents piped to outdoors. |
Within 0.9 m (3 ft.) in all directions around the open end of the vent | Within 0.6 m (2 ft.) beyond Division 1 in all directions |
| Container Fill Openings | Within 0.9 m (3 ft.) in all directions from the fill opening | Within 0.6 m (2 ft.) from Division 1 Up to 0.45 m (1.5 ft.) above floor or grade level and within 2.1 m (7 ft.) horizontally beyond Division 1* |
| *Many solvent vapours accumulate and spread near floor level because they are heavier than air. | ||